K&K Floors Home: Hardwood, Laminate, Carpet Installation, Sanding and Refinishing in VA, MD Request Free Estimate
 
> Installation Guide
> Maintenance & Care
> Warranty Info
> F.A.Q
> Terms & Policy
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Installation Guide   -   For Hardwood   |   For Laminate   |   For Carpet

Installation Guide   -   Hardwood   -   Pre-Installation

 

Storage And Handling


Solid wood flooring should be stored in the environment in which it is expected to perform. Deliver the materials to an environmentally controlled site. Materials should be allowed to acclimate for 72 hours or as long as necessary to meet minimum installation requirements for moisture content. Acclimation within a closed carton may not be adequate due to lack of air movement. Handle and unload with care. Store in a dry place being sure to provide at least a four-inch air space under cartons, which are stored upon "on-grade" concrete floors. Flooring should not be delivered until the building has been closed in with windows and doors in place and until cement work, plastering and all other "wet" work is completed and dry. Concrete should be at least 60 days old.

 

Before Installation

Installation Tips

Finishing/Refinishing


BACK TO TOP



 

   © 2004 K&K Hardwood Floor, Inc. All rights reserved.    Site Map | Terms & Policy | Contact Us